SHOP NOW

ASSEMBLY  mounting the vegeTable® is simple instructions.pdf

Step 1 VEGETABLE INSIDE ITS S-1 BAG AS DELIVERED. CAREFULLY CHECK THAT THE BAG IS NOT DAMAGED. IF IT IS DAMAGED, PLEASE NOTIFY THE COURIER BY A: "DAMAGED SOIL CONTAINER BAG" NOTICE Step 2 THIS IS WHAT YOU WILL FIND INSIDE Step 3 USE PROVIDED TOOLS OR, IF AVAILABLE, AN ELECTRIC SCREWDRIVER
Step 4 DO NOT OVERTIGHTEN ANY SCREWS: YOU WILL BE ABLE TO TIGHTEN THEM BEFORE PLACING THE LOWER ROW OF WOOD BOARDS Step 5 THIS IS HOW THE LEG FITS THE HORIZONTAL STRUCTURE Step 6 SCREW IN THE FEET. YOU CAN DO IT BY HAND OR USE A SPANNER
Step 7 FIRST FIX THE UPPER BOARD INSIDE Step 8 SET THE 4 SCREWS AND TIGHTEN THEM LITTLE BY LITTLE TOGETHER Step 9 THIS IS HOW THE CORNER SHOULD LOOK
Montaggio terminato YOUR VEGETABLE IS READY

FOR THOSE WHO CHOSE THE +H20 IRRIGATION SYSTEM

Step 1 THIS IS HOW THE INTEGRATED WATERING SYSTEM IS MADE Step 2 AFTER ASSEMBLING YOUR NEW VEGETABLE, USE QUICK SNAPS TO CONNECT THE WATERING SYSTEM. IN ORDER TO CONNECT: YOU JUST HAVE TO INSERT THE PIPE INTO CONNECTORS (GREY ELEMENTS). IN ORDER TO DISCONNECT: YOU HAVE TO PULL THE RING (DARK GREY ELEMENT) OF THE CONNECTOR TOWARD THE OUTSIDE WITH ONE HAND, WHILE EXTRACTING THE PIPE WITH THE OTHER HAND